Wastewater treatment facilities for the Kharbeyskoye NGKM
18.11.2024
Launch of a biological treatment plant for domestic wastewater using SBR technology.
Automated drainage station PlanaPoint-A
25.10.2024
Installation of a fully factory-ready PlanaPoint-A block drainage station at the site for receiving imported wastewater.
Sewage pumping stations for Kharbeyskoye NGKM
05.10.2024
Commissioning and putting into operation of a pumping station kit for an oil and gas condensate field.
ECWATECH-2024: Development of technologies and cooperation
20.09.2024
International exhibition ECWATECH-2024 ended in Moscow
Russian pumps instead of imported ones (anti-sanction replacement)
13.09.2024
Replacement of imported centrifugal electric pump units with domestic ones
Compact biological treatment plant for domestic wastewater
14.08.2024
The biological treatment plant for the site of the EKAD-Yuzhny industrial park using MBBR technology is ready for operation.
Serial production of PlanaPoint drainage stations has begun
24.06.2024
PLANA Engineering Group has switched to serial production of automated drainage stations of its own design.
The VIII All-Russian Water Congress and Exhibition VODEXPO-2024
20.06.2024
From June 18 to June 20, 2024, the VIII All-Russian Water Congress and Exhibition VODEXPO-2024 took place in Moscow.
Сontainerized wastewater treatment plant for the industrial park
27.05.2024
A block-modular containerized wastewater treatment plant for treating oily and rainwater wastewater was installed on the industrial park site.
Automated drainage stations for Kurgan region
15.12.2023
Drain stations for receiving septic waste can reduce harm from unauthorized discharge into the sewer system
Biological treatment station based on SBR technology
04.12.2023
Commissioning of a biological treatment station for household wastewater on the Gydan Peninsula.
Automated drain station with mechanical cleaning unit
16.10.2023
The PlanaPoint wastewater drainage station began operation in Krasnoyarsk.
Oily wastewater treatment plant for Chernogorskaya CHPP
20.09.2023
A block-modular installation for treating oily industrial and rainwater wastewater was shipped to the Chernogorskaya CHPP (Norilsk).
Vacancy for B2B sales manager
31.08.2023
PLANA Engineering Group is looking for a sales manager in the B2B segment.
Block-modular biological treatment plant for waste processing landfil
10.06.2023
Block-modular WWTP was shipped to a solid waste landfill in the Moscow region.