Storm water treatment plant
- Productivity 90 m3/h.
- TPP «Simferopolskaya», Republic of Crimea.
- Installation in the customer’s building.
- Design, manufacture, installation, commissioning.
- Technological adjustment of the cleaning process
- 2018-2019
Productivity 90 m3/h
Storm water treatment plant
The PlanaOS-L treatment facilities are designed for the treatment of normatively polluted surface rain and melt wastewater coming from the territory of a thermal power plant. Cleaning standard — for discharge into a reservoir of fishery importance. The equipment of the treatment plant was installed in the production building of the Customer. The technological scheme provides for sand trapping and averaging of the runoff, reagent treatment of the runoff, laminar settling, two-stage pressure filtration, ultraviolet and reagent disinfection of the runoff, dehydration of the sand pulp and trapped sediments.