Drinking water treatment plant (NPS-2 «Zapolyarye»)

portfolio
portfolio
Project Info
  • Category: PlanaVP, PlanaVP-M
Project Details

The capacity is 4 m3/hour.

More Project Details
Drinking water treatment plant

Drinking water treatment plant.

  • Productivity 4 m3/hour (73 m3/day).
  • Transneft, PS-2 Zapolyarye.
  • Installation at the customer’s premises.
  • Production, installation supervision, commissioning
  • 2016

The water treatment plant provides water purification according to the declared indicators to concentrations not exceeding the MPC established in SanPiN 2.1.4.1074-01 “Drinking water. Hygienic requirements for water quality of centralized drinking water supply systems. Quality control».
The complex of equipment for the installation of water treatment of drinking water includes: the necessary technological and auxiliary equipment that ensures round-the-clock operation of the pumping station for domestic and drinking water supply in automatic mode; blocks of automatic control and management of the operation of the equipment complex for the water treatment plant.

Other projects

Reconstruction of KOS-50 Gubkinsky GTP (SBR)
+
Reconstruction of KOS-50 Gubkinsky GTP (SBR)
Capacity 50 m3/day.
PlanaOS-B-M, Process-SBR, Service
Drinking water treatment plant (NPS-2 «Zapolyarye»)
+
Drinking water treatment plant (NPS-2 «Zapolyarye»)
The capacity is 4 m3/hour.
PlanaVP, PlanaVP-M

Search