Sewage pumping stations (Kharbeyskoye NGKM)

portfolio
portfolio
Project Info
  • Category: PlanaNS-K
Project Details

Pumping of untreated domestic wastewater

More Project Details
Sewage Pumping Station for Far North

Sewage pumping stations

  • Capacity 9…25 m3/hour.
  • Design for the Far North
  • Kharbeyskoye NGKM
  • Production, SHMR, commissioning
  • 2022…2024

PlanaNS-K sewage pumping stations are designed to pump untreated domestic wastewater generated at oil production facilities to treatment facilities. The pumping stations are manufactured in accordance with the oil and gas industry standards and ensure year-round operation of the sewage system in the climatic conditions of the Far North and permafrost. The pumping stations operate fully automated. The pumping stations are equipped with a modular shelter with an efficient ventilation and heating system. The pumping station receiving tank is insulated and has cable electric heating.

Other projects

Search