Installation of flotation and filtration treatment (KTK-R)

portfolio
portfolio
Project Info
  • Category: PlanaOS-P-Flo, Process-Flo
Project Details

The capacity is 3 m3/hour.

More Project Details
Installation of flotation and filtration treatment

Industrial and storm water treatment plant

  • CPC, PS-8
  • Productivity 3 m3/h.
  • Flotation-filtration technology
  • Production, installation supervision, commissioning
  • Technological adjustment of the biological treatment process
  • 2015

The block-modular unit PlanaOS-P-Flo is designed to treat oil and oil-contaminated industrial and rainwater from the production site of the oil pumping station of the CPC pipeline system. The installation equipment is made in explosion-proof design. The accumulation tank for oil products is equipped with an oil skimmer.

Other projects

Water treatment plant at GNPS-1 «Zapolyarye»
+
Water treatment plant at GNPS-1 «Zapolyarye»
Capacity 73 m3/day
PlanaVP, PlanaVP-M
Drinking water treatment plant (NPS-2 «Zapolyarye»)
+
Drinking water treatment plant (NPS-2 «Zapolyarye»)
The capacity is 4 m3/hour.
PlanaVP, PlanaVP-M