Oiled wastewater treatment plant.
- Productivity 5 l/s.
- Chelyabinskaya GRES (FORTUM).
- Production, installation supervision, commissioning
- 2015 — 2016
Capacity 5 l/s
Oiled wastewater treatment plant.
The PlanaOS-L unit ensures the treatment of oil and oil-contaminated industrial wastewater from the site of the state district power station to the standards for discharge into a reservoir of fishery significance. The treatment technology provides for averaging, reagent treatment and laminar settling of wastewater, as well as two-stage post-treatment on cassette easy-to-replace filters.