Drinking water treatment plant (ESPO)

portfolio
portfolio
Project Info
  • Category: PlanaVP-Block
Project Details

Productivity is 10 m3/hour.

More Project Details
Drinking water treatment plant

Drinking water treatment plant

  • Capacity 70 m3/day
  • ESPO, MG «Kuyumba-Taishet».
  • Installation in the customer’s building.
  • Production, installation supervision, commissioning
  • 2016

The unit is located in the building of the pumping station for domestic and drinking water supply and is designed to purify water from surface water intake from pollutants in accordance with the requirements of SanPiN 2.1.4.1074-01 “Drinking water. Hygienic requirements for water quality of centralized drinking water supply systems. Quality control».

Other projects

Reconstruction of KOS-50 Gubkinsky GTP (SBR)
+
Reconstruction of KOS-50 Gubkinsky GTP (SBR)
Capacity 50 m3/day.
PlanaOS-B-M, Process-SBR, Service
Installation of flotation and filtration treatment (KTK-R)
+
Installation of flotation and filtration treatment (KTK-R)
The capacity is 3 m3/hour.
PlanaOS-P-Flo, Process-Flo

Search