Anti-sanction modernization of the pumping station

portfolio
portfolio
Project Info
  • Category: PlanaVP-Block
Project Details

Replacement of imported centrifugal electric pump units with domestic ones

More Project Details
Replacement of imported centrifugal electric pump units with domestic ones

Pumping station for pumping wastewater into an absorption well.

  • Capacity 22 m3/hour, pressure 250 m.
  • Achimov deposits of the Urengoy oil and gas condensate field.
  • Delivery and replacement of pumping units, commissioning.
  • 2022

Special requirements are imposed on pumping equipment for pumping water and purified wastewater into absorption wells due to high pressure and performance parameters. Delivery, installation and commissioning of domestic pumps to replace imported ones (explosion-proof design) were completed. The efficiency of the pump units was maintained.