Drinking Water Treatment Plant (CPC)

portfolio
portfolio
Project Info
  • Category: PlanaVP-Block
Project Details

Capacity 48 m3/day.

More Project Details
Drinking Water Treatment Plant

Installation of drinking water treatment (USPV).

  • Capacity 48 m3/day.
  • Caspian Pipeline Consortium.
  • Production, supervision, commissioning.
  • 2022

Installation PlanaVP is designed to purify the water coming from the village water intake from pollutants in accordance with the requirements of SanPiN 2.1.4.1074-01 “Drinking water.  Hygienic requirements for the water quality of centralized drinking water supply systems. Quality control”. The installation is equipped with storage tanks of raw and clean water.

Other projects

Search